Workflows

Estimate Optical Band Gap

Uvvis Band-gap

Build a Tauc analysis from UV-Vis data, review the fit region and transition assumption, and inspect an optical band-gap estimate in NotyPlot.

Find Raman Peaks

Raman Find-peaks

Detect and review Raman peak positions in NotyPlot. Inspect baseline, fluorescence and nearby features before using the peak results.

Review FTIR Functional Groups

Ftir Functional-groups

Inspect functional-group suggestions alongside FTIR band evidence. Use the spectrum and sample context to review assignments in NotyPlot.

Find FTIR Absorption Bands

Ftir Find-bands

Detect FTIR bands and inspect their positions against the original spectrum. Review baseline and signal orientation before exporting results.

Review XRD Phase Candidates

Xrd Identify-phases

Compare an XRD pattern with reference patterns in NotyPlot. Inspect candidate phase matches and unexplained peaks before assigning phases.

Run Williamson-Hall Analysis

Xrd Williamson-hall

Review XRD peak broadening with a Williamson-Hall analysis. Inspect the selected peaks and fit before reporting size and strain estimates.

Estimate Crystallite Size with Scherrer

Xrd Crystallite-size

Estimate crystallite size from fitted XRD peaks using the Scherrer workflow. Review wavelength, peak widths and model assumptions in NotyPlot.

Fit XRD Peaks

Xrd Fit-peaks

Fit diffraction peaks in NotyPlot and inspect peak position, width and fit quality before using the values in further XRD calculations.

Find XRD Peaks

Xrd Find-peaks

Detect diffraction peaks and build a reviewable peak table in NotyPlot. Inspect background, weak features and overlaps before using the result.